What we do

Villa construction in Marrakech: complete expertise, one single contact.

From the first stone to handing over the keys, BTP Services Titanium takes care of everything.

01. Architectural design

Custom drawings by our partner architects. Building permit, 3D rendering and landscape integration. You see your villa before the first spadeful of earth.

02. Structural works

Foundations to Moroccan RPS standards, reinforced concrete, waffle slabs. Our engineers supervise every pour for strength guaranteed for 50 years.

03. Finishing works

Plumbing, electrical, external thermal insulation, marble tiling, aluminium/wood joinery. Every finish is chosen with you and carried out by certified craftsmen.

04. Swimming pool & outdoors

Custom pool (concrete, liner, infinity edge), pool house, landscaped garden and architectural lighting. Your outdoor space deserves excellence.

05. Home automation & air conditioning

VRF/VRV multi-split system, KNX home automation, home cinema. Turn your villa into a smart home from the construction stage.

06. Snagging & inspection

Buy with confidence. Our team inspects your property in Marrakech and writes a detailed defect report before purchase.

Talk about my project

Our services · Structural works

Turnkey structural works, from foundations to roof.

Each package is priced as a lump sum and clearly described: you know exactly what is included, step by step.

01 Preparation & studies

  • Site set-up: site base, fencing, site board
  • Temporary water & electricity connections
  • Setting-out and “good ground” geotechnical provision

02 Substructure

  • Bulk earthworks, stripping, levelling
  • Excavation, strip or pad footings, blinding concrete
  • Ground beams, retaining walls, backfilling

03 Superstructure

  • Load-bearing and partition walls, columns, lintels
  • Horizontal and vertical ring beams
  • Parapets with top ring beam, vibrated C25/30 concrete

04 Floor slabs

  • Beam-and-block or waffle slab (coffers, cross ribs)
  • Embedded reinforcing strips to engineering drawings, beams
  • Openings, B25 topping slab, waterproofing substrate

05 Stairs & special works

  • Reinforced-concrete stairs: layout, formwork, propping
  • Vibrated pouring, curing, striking and making good
  • Specific works to drawings

06 Outdoor works

  • Pool and jacuzzi structure, plant room
  • Masonry boundary walls with ring beams
  • Perimeter terrace slabs on welded mesh
  • C25/30Vibrated concrete for structural elements
  • Engineering drawingsReinforcement carried out to the engineering firm's drawings
  • Lump sumsPer m², per linear metre or per package, itemised
  • Built-in networksPlumbing and electrical provisions set in the structure

Pre-installations

Everything is planned in the concrete, before it is poured.

Openings, conduits and connection points are installed during the structural works. The result: no chasing in walls, no core drilling in slabs, and follow-on trades that can start straight away.

  1. Electrical provisionsConduits and boxes embedded in slabs and walls, following your electrical plan.
  2. Plumbing set in placeWater supply and PVC drainage pipes laid and tested before pouring.
  3. Openings & shaftsPassages for ducts, ventilation, air conditioning and stairwell openings planned on drawings.
  4. Pool & jacuzziPlant room structure and PVC/electrical networks built into the structural works.
  5. Technical provisionsVertical starters, waterproofing supports and anchor points ready for the next trades.
Reinforcement checked before pouring
Floor slab reinforced before pouring

Without pre-installation

Chasing and core drilling afterwards, weakened structure, plaster repairs, dust and lost weeks.

With BTP Services

Networks built in from the structure, intact walls and trades that start as soon as the structural works end.

Below-ground works

Basement waterproofing and drainage

Basement wall waterproofing (2 coats)

Basement wall waterproofing

Waterproof coating applied in 2 coats to concrete and masonry basement walls, before backfilling.

Delta-MS drainage membrane

Perimeter drainage, Delta-MS membrane

Delta-MS dimpled membrane laid against the basement walls, at the bottom of the perimeter trench, before backfilling.

Reinforced-concrete inspection chamber

Reinforced-concrete chamber & lifting pump

Formed and reinforced concrete chamber, coated on the outside, fitted with a lifting pump discharging to the wastewater chamber.

Schedule & deadlines

A clear schedule, kept week after week.

Example schedule for the structural works of a two-storey villa of about 300 m² with a pool. Every project receives its detailed schedule before start.

  • ≈ 20 weeksIndicative duration of the structural works for this type of villa, set in writing at the start.
  • Approved milestonesFoundations, each floor slab and handover are approved with you or your architect.
  • Weekly updateActual progress compared with the schedule, with site photos every week.

Indicative schedule. Actual durations depend on the drawings, the ground (soil category A/B) and approval times.

Our method

Rigour, step by step.

  1. 1

    File review

    Analysis of the architect's and engineering firm's drawings, site visit, identification of the pre-installations required.

  2. 2

    Detailed lump-sum quote

    Each package is described item by item, with its unit (m², linear metre, lump sum) and what it includes.

  3. 3

    Contractual schedule

    Gantt chart provided before start, with milestones and the handover date of the structural works.

  4. 4

    Controlled execution

    Reinforcement checked before each pour, vibrated concrete, proper curing, networks laid and tested before closing.

  5. 5

    Transparent monitoring

    Weekly update with photos, actual progress compared with the schedule and early warnings.

  6. 6

    Handover

    Final inspection with you, clearing of snags and handover to the finishing trades.

Your structural works deserve a rigorous partner.

Send us your drawings: we will get back to you with a detailed lump-sum quote and a construction schedule.

Send my drawings