Villa, basement + two storeys · Marrakech
Scroll the timeline and tap a photo to enlarge it.
-
08/2023
The bare plot, before works
-
11/2025
Cut-and-bent reinforcement delivered to site
-
11/2025
Foundations: strip footing poured
-
11/2025
Reinforced footings and ground beams in the excavation
-
12/2025
Supplies on site: concrete blocks and slab infill blocks
-
12/2025
Site office set up
-
12/2025
Formwork and propping of the basement slab
-
01/2026
Team on column formwork, concrete pump standing by
-
01/2026
Pouring a column with the concrete pump
-
01/2026
Slab and ground-floor wall formwork
-
03/2026
Concrete delivered by truck mixer
-
06/2026
The villa rising: basement and two storeys
-
06/2026
Site hoarding in BTP Services Titanium colours